Leon River bridge project updated

Although it may seem painstakingly slow to some, work is being done on the proposed Leon Street bridge over the Leon River.

Charles Smith, Texas Department of Transportation (TxDOT) area engineer, told Coryell County commissioners on Monday that the scope of work is still being developed.

He estimated the design work will begin in mid- to late spring.

 

To view more please log in or subscribe to the digital edition https://www.etypeservices.com/Gatesville%20MessengerID440/

The Gatesville Messenger

116 S. 6th St.
Gatesville, TX 76528
PH: (254) 865-5212
FAX: (254) 865-2361
www.gatesvillemessenger.com