Construction project slated until 2020

The Texas Department of Transportation (TxDOT) began a project to rehabilitate a portion of State Highway 36 in Coryell and Bell counties on Monday, Oct. 1.

The project, designed to increase safety along SH 36, will resurface and widen 11 miles of the existing roadway from FM 931 at Flat, east of Gatesville, to the west side of the SH 36 bridge at Belton Lake in Bell County.

 

To read more please log in or subscribe to the digital edition https://www.etypeservices.com/Gatesville%20MessengerID440/

The Gatesville Messenger

116 S. 6th St.
Gatesville, TX 76528
PH: (254) 865-5212
FAX: (254) 865-2361
www.gatesvillemessenger.com